POLICIES 250-299

Policy & Procedures 250

250 Architectural Control

I. POLICY
The AECC shall be responsible for the establishment of guidelines, processes, fee schedules, and enforcement procedures, subject to the approval of the POA Board of Directors.

II. RESPONSIBILITIES
General Manager

III. SCOPE
The AECC’s powers are limited and may not be expanded on its own motion. The applicable guidelines and restrictions are likewise set, and the AECC and the AECD are without power to expand these restrictions through enactment directly or indirectly by interpretation or administrative rule making. The scope of its powers is set forth in the Declaration of Covenants and Restrictions and in any applicable Board resolutions.
The AECC must submit to the Board any proposed substantive or procedural change in the design process it believes appropriate. The Board will consider and make a determination on such recommendation. Until the Board acts, no proposed change shall be effective and may not be applied to any applicant.

IV. DEFINITIONS
AECC: Architectural and Environmental Control Committee
AECD: Architectural and Environmental Control Department

V. RELATED POLICIES OR DOCUMENTS
251 AECC review of all POA projects
Procedure 250.1 AECD Relationship with Company
I. PROCEDURE
The Company will at all times maintain a list of lot numbers which will constitute geographical areas for which the Company will perform the architectural review function on the submittal of plans for initial home construction. The Company will establish architectural guidelines, review and approve plans, approve builders, and act on variance requests. The AECD will provide the enforcement necessary to assure that construction and landscaping is according to plan. Throughout this process and continuing, the Association will have the responsibility of
enforcing the provisions of its “RULES AND REGULATIONS PERTAINING TO APPROVED BUILDERS, SUB-CONTRACTORS, AND SERVICE PERSONNEL”, in order to assure compliance with proper job site management, traffic safety, and other associated considerations.
Immediately following initial occupancy of a new home in a non-Class “B” neighborhood, the AECD will assume full architectural control of any subsequent construction activity at that
address, and will do so in accordance with the appropriate architectural guidelines for that
neighborhood.
Immediately following the sale of the last unit in a Class “B” neighborhood the AECD will assume full architectural control of any subsequent construction activity in that neighborhood, and will do so in accordance with the appropriate architectural guidelines for that neighborhood.

II. RESPONSIBILITIES
General Manager, AECD and the Company.

III. SCOPE

IV. DEFINITIONS
Company: The Big Canoe Company
AECC: Architectural and Environmental Control Committee
AECD: Architectural and Environmental Control Department

V. RELATED POLICIES OR DOCUMENTS
Procedure 250.2 AECD Rules and Enforcement
I. PROCEDURE
The AECD shall be responsible for the enforcement and procedures and the establishment of guidelines, processes and fee schedules. These shall be prominently posted on the POA website in an up-to-date condition.
The AECD will be responsible for identifying violations of these guidelines through property owner complaints, POA employee reports, or through its own vigilance, and shall communicate with the offending property owner in an attempt to remedy the condition. If the offending property owner does not respond positively within a reasonable time, the AECD will act within the appropriate rules and regulations.

II. RESPONSIBILITIES
General Manager, AECD and through its committee, the AECC.

III. SCOPE

IV. DEFINITIONS
AECC: Architectural and Environmental Control Committee
AECD: Architectural and Environmental Control Department

V. RELATED POLICIES OR DOCUMENTS
Procedure 250.3 Road Impact Fee
I. PROCEDURE
A Road Impact Fee will be charged for trucks and equipment entering Big Canoe in conjunction with property owner construction projects This fee will be billed and must be paid before construction can begin. The fee is established in the annual budget.

II. RESPONSIBILITIES
General Manager

III. SCOPE

IV. DEFINITIONS

V. RELATED POLICIES OR DOCUMENTS
starchevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram